Product Details
Place of Origin: China
Brand Name: YLFDJ
Certification: ISO CE
Model Number: YLGF-30WF
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: $2,970.00/sets 1-1 sets
Packaging Details: Export standard packing
Supply Ability: 500 Set/Sets per Month
Warranty: |
1 Year/1000 Hours, 1000 Running Hours |
Rated Voltage: |
400/230 Or As Customer Require |
Rated Current: |
43.2A |
Speed: |
1500RPM/1800RPM |
Frequency: |
50HZ/60HZ |
Starting System: |
24V DC Electric Start |
Type: |
Silent Type, Open Frame, Open/silent/trailer/container |
Cooling System Type: |
Water Cooling System |
Engine Brand: |
Famous Brand Engine |
Alternator: |
Stamford/Marathon/Leroy Somer/ENGGA/Faraday/YLFDJ |
Control Panel: |
Smartgen/Deapsea |
ATS: |
Smartgen/ABB |
Color: |
Customers' Requirement |
Function: |
Provide Electric Power |
Certificate: |
CE(SGS)/ISO9001(SGS)/SASO(TUV) |
Starting Method: |
24V DC Start Battery |
Port: |
Guangzhou Shenzhen Foshan |
Warranty: |
1 Year/1000 Hours, 1000 Running Hours |
Rated Voltage: |
400/230 Or As Customer Require |
Rated Current: |
43.2A |
Speed: |
1500RPM/1800RPM |
Frequency: |
50HZ/60HZ |
Starting System: |
24V DC Electric Start |
Type: |
Silent Type, Open Frame, Open/silent/trailer/container |
Cooling System Type: |
Water Cooling System |
Engine Brand: |
Famous Brand Engine |
Alternator: |
Stamford/Marathon/Leroy Somer/ENGGA/Faraday/YLFDJ |
Control Panel: |
Smartgen/Deapsea |
ATS: |
Smartgen/ABB |
Color: |
Customers' Requirement |
Function: |
Provide Electric Power |
Certificate: |
CE(SGS)/ISO9001(SGS)/SASO(TUV) |
Starting Method: |
24V DC Start Battery |
Port: |
Guangzhou Shenzhen Foshan |
30kva silent generator price 24KW silent generator Open Frame
Genset Model | YLGF-24WF | |||||
Genset | Power Capacity (kw/kva) | 24/30 | ||||
Rated Voltage (V) | 400/230 | |||||
Rated Current (A) | 43.2 | |||||
Rated Frequency (Hz) | 50/60 | |||||
Rated Speed (rpm) | 1500/1800 | |||||
Power Factor / Phase | Cos 0.8 Lagging, 3 phase | |||||
Cooling System | Closed cycle water-cooled with fan,water tank | |||||
Overall Dimension (L×W×H) (mm) | 2100 x900x 1300 | |||||
Gross Weight (kg) | 920 | |||||
Engine Brand | Weifang | |||||
Diesel Engine |
Engine Model | K4100D | ||||
Prime Power (kw) | 31 | |||||
Engine Structure | 4 Cylinder,Vertical,Inline,4 stroke | |||||
Bore×Stroke (mm) | 100x115 | |||||
Displacement (L) | 3.61 | |||||
Compression Ratio | / | |||||
Lube Capacity (L) | / | |||||
Fuel System | PT type fuel injection pump | |||||
Fuel Consumption (g/kw.h) | 215 | |||||
Lube Consumption (g/kw.h) | 0.5% | |||||
Rotating Speed (rpm) | 1500/1800 | |||||
Speed Governing | machinery speed governor | |||||
Starting Method | By 24V batteries | |||||
Alternator Brand | YLFDJ | |||||
Alternator | Alternator Model | YL-24 | ||||
Insulation Class | Class H | |||||
Steady Voltage Regulation | ≤ +/- 0.5% | |||||
Instant Voltage Ragulation | -15%~+20% | |||||
Voltage Fluctuation Rate | ≤ +/- 0.5% | |||||
Steady Frequency Regulation | ≤ +/- 0.5% | |||||
Instant Frequency Ragulation | -7%~+10% | |||||
Phase/Connection Type | 3 phase 4 wire/Y type | |||||
Controller | Controller Brand | HGM410N |
Payment & Delivery Terms
1.Minimum Order Quantity: 1 set.
2.Packing Details: standard export packing.
3.Delivery Time: 30 working days after receipt of deposit or original L/C.
4.Payment Terms: T/T (30% as deposit,the balance to be paid before delivery) or L/C.
5.Valid time of the quotation: 30 days.
Attachment list
1.Fuel connecting pipes
2.12V DC battery c/w battery cables 2 sets
3.Industrial type silencer c/w stainless steel flexible exhaust bellows
4.Shock absorption rubbers 4 pcs
5.The tool kit and 1 set of manuals (English version).
FAQ
Q: What is your MOQ of this item?
A: Our MOQ is one set generator,EX factory price.For full container order our price is FOB price.
Q: Is it ok to make customers’ own brand name?
A: Sure, we can be your OEM manufacturer with your authorization of brand.
Q: What are your payment terms?
A: 30% T/T deposit, 70% balance before shipment or L/C at sight.
Q: How long is your warranty?
A: 12months or1000 hours basis on the earlier one.
Q: What is the delivery time?
A: 15 work days after receiving your T/T deposit or L/C.
Q: What is your packing way ?
A: Factory standard packing is plastic film, for other packing way should recalculate the packing cost.